العودة إلى الوظائف
Principal Engineer
Petrofac
Abu Dhabi, AZ, AEFull-timeالهندسة٢١ نيسان ٢٠٢٦
تفاصيل الوظيفة
The Right‑First‑Time (RFT) Lead ensures that all construction installation activities, pre-commissioning are performed with correct quality the first time, minimizing rework and delays to commissioning & Start-up. The role integrates quality assurance, construction execution, punch management, and completions readiness to ensure systems are delivered defect‑free and aligned with project specifications, ITR requirements, and commissioning priorities.
**Key Responsibilities**
**1. Right‑First‑Time Quality Leadership**
* Implement and lead the **Right‑First‑Time initiative** across all construction disciplines (Mechanical, Piping, Electrical, Instrumentation, Telecom, Civil).
* Ensure correct installation quality to **reduce punch items, NCRs, and rework**.
* Verify construction activities follow IFC drawings, standards, vendor specifications, and method statements.
* Promote a culture of **“Build It Clean, Build It Once”** across the project.
**2. Construction Quality Verification**
* Conduct regular discipline walkdowns to verify installation quality before handing over to QA/QC or Completions.
* Ensure all field installations meet requirements for ITR completion (A, B, C check sheets).
* Identify installation gaps early and ensure corrective actions are implemented before system handover.
* Audit construction teams for workmanship, materials handling, and adherence to procedures.
**3. Punch Management & Resolution**
* Lead efforts to **minimize punch items** by preventing construction errors.
* Ensure that any punch items raised are addressed quickly and closed before Mechanical Completion.
* Track recurring punch trends and work with construction leads to eliminate root causes.
* Coordinate punch closure in line with system RFT and MC priorities.
**4. Interface With Completions & Commissioning**
* Align RFT activities with the **Completions (MC / RFT / RFC / RFSU)** sequence.
* Ensure construction delivers systems truly ready for testing—mechanically complete, punch‑free, and installation‑verified.
* Support Commissioning team by ensuring:
+ Correct installation
+ Verified cabling and tubing
+ Proper equipment orientation
+ Vendor requirements met
+ Documentation updated
* Prevent handover of incomplete or defective systems to Commissioning.
**5. Planning, Progress Tracking & Reporting**
* Develop and maintain an **RFT Execution Plan** with weekly and monthly targets.
* Track RFT KPIs:
+ % Reduction in rework
+ Punch reduction rate
+ Repeated error frequency
+ ITR rejection trends
* Provide daily and weekly RFT status reports to Construction Manager / Completions Manager.
* Present recurring quality issues and coordinate cross‑discipline corrective action plans.
**6. Documentation & Compliance**
* Ensure compliance with:
+ Project Quality Plan
+ ITRs / QA Check Sheets
+ International codes (API, ASME, ANSI, IEC, ISA)
+ ADNOC specifications
* Perform document reviews including IFC drawings, vendor docs, method statements, quality procedures, and red‑line markups.
* Ensure all work packs and RFT dossiers are complete before system handover.
**7. HSE Responsibilities**
* Ensure all RFT inspections are conducted safely under the PTW system.
* Identify any unsafe installation practices and coordinate immediate corrective action.
* Support HSE during audits by providing quality‑related evidence and documentation.
**Qualifications & Experience**
**Education**
* Bachelor’s Degree in Mechanical, Process, Electrical, Instrumentation, or related Engineering field.
**Experience**
* **10–15 years** oil & gas construction/commissioning experience.
* Minimum **5 years** in a Quality / Completions / RFT leadership role.
* Strong experience with EPC and brownfield projects.
* Familiar with Completions Management Systems.
**Technical Knowledge**
* Strong understanding of construction quality requirements.
* Excellent knowledge of P\&IDs, isometrics, SLDs, loop diagrams, cable schedules.
* Ability to identify installation defects early.
* Familiar with ITR requirements for all disciplines.
**Key Skills & Competencies**
* Strong leadership and coordination skills.
* Ability to challenge construction teams constructively.
* Excellent knowledge of QA/QC processes.
* Proactive identification of issues before they escalate.
* Strong communication and reporting skills.
* Root cause analysis and corrective action planning.
**Deliverables**
* RFT Work Process & Strategy
* Weekly RFT Performance Reports
* Punch Trend Analysis & Reduction Plans
* Installation Quality Observation Reports
* RFT Checklists and Validation Records
* Input to Mechanical Completion & Handover Packages
#LI-HS1